The below photographs describe the progress of The Cave Garden in reverse order (newest at the top of the page) from the installation of lighting in a bare room at the beginning of March 2019 to the latest developments from the visiting public from this week.  

20190414_123906.jpg
20190414_123819.jpg
20190331_140451.jpg
20190331_134911.jpg
20190329_135646.jpg
20190329_135608.jpg
20190329_135534.jpg
A grass covered table for children to sit at to make their flowers

A grass covered table for children to sit at to make their flowers

Themed lighting to create a forest feel is accompanied by a woodland soundscape played in the back ground

Themed lighting to create a forest feel is accompanied by a woodland soundscape played in the back ground

Steel “cages” are built on site

Steel “cages” are built on site

Underlay to make the “carpet” as soft as possible

Underlay to make the “carpet” as soft as possible

20190414_123918.jpg
20190414_123828.jpg
20190331_141420.jpg
20190331_135011.jpg
20190329_135554.jpg
20190329_135634.jpg
20190329_135619.jpg
Stools dot around the log-pile plinths for anyone who wishes to sit

Stools dot around the log-pile plinths for anyone who wishes to sit

Locally foraged wood, including Oak, Ash, Hazel and Poplar, fill the “cages”

Locally foraged wood, including Oak, Ash, Hazel and Poplar, fill the “cages”

The “carpet” is laid (sponsored by Grass Direct)

The “carpet” is laid (sponsored by Grass Direct)

New spot lighting installed (sponsored by Coleman Electrical)

New spot lighting installed (sponsored by Coleman Electrical)